Proposal Brief
Icon

Industry

Energy and Environmental

Icon

Sub Industry

Solar Power Generation (Renewable)

Icon

Deal Size

INR 33.75 - 37.5 Cr

Icon

Preferred Location

India

Icon

Region

Central

Icon

Open for Distressed Assets

No

Target Requirement

 S.no.

Requirements

Comments

1.

Deal Size

5 MN USD

2.

Preferred Location

No Preference – Open to acquisition across Country

3.

Required estimated cost of project

It is a function of the economics of the Project. In case of Greenfield projects, Panels will always be in the scope

4.

Preferred Investment Model

70:30 (Debt:Equity)

5.

Stake Required

100%

(In case of Captive Projects – the entire stake which is not held by the Captive Investor, i.e., 100% stake held by the Project Developer)

6.

Full PPA / Part PPA?

Prefer to have a project with the PPAs tied up. However, if land and all clearances are in place, the project can be considered.

7.

Minimum Size (MW)

10MWp (No Cap on the upside)

Business Operation Information
Business Documents