Posted By - Investment Banker
S.no. |
Requirements |
Comments |
1. |
Deal Size |
5 MN USD |
2. |
Preferred Location |
No Preference – Open to acquisition across Country |
3. |
Required estimated cost of project |
It is a function of the economics of the Project. In case of Greenfield projects, Panels will always be in the scope |
4. |
Preferred Investment Model |
70:30 (Debt:Equity) |
5. |
Stake Required |
100% (In case of Captive Projects – the entire stake which is not held by the Captive Investor, i.e., 100% stake held by the Project Developer) |
6. |
Full PPA / Part PPA? |
Prefer to have a project with the PPAs tied up. However, if land and all clearances are in place, the project can be considered. |
7. |
Minimum Size (MW) |
10MWp (No Cap on the upside) |
Deal Size
INR 33.75 - 37.5 Cr
Target Location
India
Division
Solar Farms
Industry
Energy and Environmental
Sub-Industry
Solar Power Generation (Renewable)
Funding Sources
Cash,Fresh Debt,Fresh Equity,Share Swap
Synergies Sought
Manufacturing Strengths (Production/Operations)
Deal Option
Complete Buyout
Industry
Energy and Environmental
Sub-Industry
Solar Power Generation (Renewable)
Division
Division`s Buyers/Customers
Division`s Plant Location
Division`s Products/Services
If you are interested to connect with this party, please send an Expression of Interest and receive Information Memo to take this opportunity further